Since the creation of this new model of Government, Artemisa Province has been developing the investment process, incorporating the use of Decree 327/14; which endowed the investment process with essential elements, tempered to the updating conditions of the economic model; putting end to the legislative dispersion in this matter.
Rehabilitation, remodeling, replacement, capital repair, restoration, expansion and modernization actions are considered investments.
The construction sector includes, among other activities, engineering-geological investigations applied to construction; the elaboration of designs for construction and assembly activities; the construction of civil, industrial, engineering, berthing and dredging works; as well as the production and marketing of construction materials and other products.
For 7 years after having been created, our Province has been working (as a priority within the investment and maintenance plan) on all the infrastructure: roads, electricity networks andhydro-sanitary networks; as the main actions to be carried out for an economic and social development of the Province.
These are the main investment works in the Province, which are currently offering services.
- Artemisa’s Boulevard.
- Artemisa’sMusic House.
- Alquizar’s agricultural market.
- Guira de Melena’s agricultural market.
- AHS Park.
- 3D room.
- Coppelia.
- Etecsa’s Tele-Center.
The Province continues the investment process of great social impact works, among which the following works -by municipalities- stand out:
- Continuity of the Manuel González Polyclinic in Bahia Honda municipality, with a 400 OMP approved plan as total amount.
- Mariel Polyclinic in Mariel municipality,with a 300 OMP approved plan as total amount.
- Continuity of Vicente Mora Theater in Guanajay municipality, with a 150 OMP approved plan as total amount.
- Continuity of José Ramón Martínez Pediatric Hospital capital repair in Guanajay municipality, with a 158.81 OMP approved plan as total amount.
- Continuity of Mártires de Tarara School in Bauta municipality, with a 250 OMP approved plan as total amount.
- Rehabilitation of the east area sewerage network in Bauta municipality, with a 735 OMP approved plan as total amount.
- Continuity of sewer and Las Margaritas oxidation lagoon rehabilitation in Bauta municipality, with a 1,050 OMP approved plan as total amount.
- Continuity of Eduardo Abela School in San Antonio de los Baños municipality, with a 400 OMP approved plan as total amount.
- Rehabilitation of Batalla de Jijiga School network in San Antonio de los Baños municipality, with a 393.05 OMP approved plan as total amount.
- “Cuenteros” rehabilitation in San Antonio de los Baños municipality, with a 200 OMP approved plan as total amount.
- Continuity of Yemen-Artemisa Polytechnic in Artemisa municipality, with a 450 OMP approved plan as total amount.
- Continuity of Teatro Juárez capital repair in Artemisa municipality, with a 1,600 OMP approved plan as total amount.
- Continuity of Waterloo Conductive rehabilitation (Artemisa’s water supplier); which has an approved plan of 1,119.51 OMP for this present year 2018 in total currency.
- “El Rancho” -community in Artemisa-has a water supply system; which was approved a plan of 355.20 OMP, for this year 2018as total currency.
- Campismo Caridad Clinic in Candelaria municipality, with a 26.31 OMP approved plan as total amount.
- “El Brujito” Clinic in Candelaria municipality, with a 26.31 OMP approved plan as total amount.
- Continuity of Teacher Training Networks in San Cristóbal municipality, with a 401.94 OMP approved plan as total amount.
- Continuity of Maternal Home in San Cristóbal municipality, with a 350 OMP approved plan as total amount.
- Incinerator in San Cristóbal municipality, with a 70 OMP approved plan as total amount.
- Assembly of a pumping equipment, with a 348.70 approved plan as total amount.
- Well drilling, with a 824.3 OMP approved plan as total amount.
- Measuring meters, with a 262.5 OMP approved plan as total amount.
- GEARH macro measurement program, with a 157.5 OMP approved plan as total amount
- Continuity of Ariguanabo access road, with a 1,050 OMP approved plan as total amount.
- Continuity of Artemisa access road from the highway, with a 1,352.12 OMP approved plan as total amount.
- “Theater of the Assembly”, with a 200 OMP approved plan as total amount.